Performance Improvement Strategy on the Operation and Maintenance of Lontar Power Generations 3x315 MW.
(
Room
Garuda 10B, 1st Floor
)
19 Sep 18
11:30 AM
-
1:00 PM
Tracks:
TRACK C - Optimizing Plant Operation
Speaker(s):
Zuhdi Rahmanto, General Manager, PT. Indonesia Power, Labuan Coal Fired Steam Power Plant;
Herry Nugraha, Corporate Performance Senior Manager, PT PLN (Persero);
Rahmad Lubis, Lontar Power Plant General Manager, PT Indonesia Power
The purpose of this paper is to share the success story of asset management improvement on the operation and maintenance of Lontar power generations 3x315 MW (LPP) which managed by PT Indonesia Power the subsidiary company of Indonesia Stated Electric Company. The paper presents the insight into various maintenance strategies and provides their respective merits and demerits in various aspects. It then provides the detailed discussion of maintenance and operation strategies that includes applications of various methodologies and technologies that are being implemented in the field. Identify Pareto loss outage and derating, performance improvement program, replacement with existing design, replacement with new design, implementation of Targeted Boiler Management, burner retuning, and reverse engineering are part of the maintenance strategies. Finally, it ends with open challenges in implementing condition based maintenance systems. Case study of implementing the program on the maintenance and operation of LPP will be discussed in this paper. The result shows us that the overall equipment effectiveness (OEE) of LPP has been getting better during the last three years operation.