CANCELLED: Big River Steel Dropout Chamber and Offgas Duct Comparison – Spray-Cooled Equipment Compared to Pressurized Tubular Equipment
01 Jan 00
12:00 AM
-
12:00 AM
Tracks:
Electric Steelmaking
Speaker(s):
Scott Ferguson, Systems Spray-Cooled;
Mitch Olsen, Meltshop Mechanical Supervisor, Big River Steel, a U. S. Steel Company;
Jarad Havis, Meltshop Electrical Supervisor, Big River Steel, a U. S. Steel Company;
Emin Afandiyev, Project Engineer, Systems Spray-Cooled;
Louis Valentas, The Systems Group;
Eric Chodl, Project Manager, Systems
Big River Steel and Systems Spray-Cooled have successfully installed and commissioned new Spray-Cooled™ equipment for Phase 2, which included the electric arc furnace (EAF) roof, elbow, sidewall, D1, dropout chamber and offgas duct. Big River Steel’s decision to furnish the Phase 2 EAF with a spray-cooled offgas duct and dropout chamber was based on the efficiency of spray-cooled technology to achieve the required exit gas temperature with a significantly less hot face area of the offgas duct. This paper will review and compare the Phase 2 spray-cooled offgas duct and dropout chamber with the Phase 1 tubular offgas duct and dropout chamber.