Installation of First-Ever Gravity-Drained EAF Roof and Elbow and Modification of Gantry From Traditional 4-Point Lift to 2-Point Cantilever Lift at Optimus Steel
(
Room
406
)
17 May 22
2:00 PM
-
2:30 PM
Tracks:
Electric Steelmaking
Speaker(s):
Scott Ferguson, Systems Spray-Cooled;
Ricardo Anawate, Vice President of Operations, Optimus Steel LLC;
Marcos Dal Ponte, Melt Shop Superintendent, Optimus Steel LLC;
Eric Chodl, Project Manager, Systems
In order to increase the availability and safety and reduce the maintenance of its 120-mton electric arc furnace (EAF), Optimus Steel decided to replace its tubular EAF roof and elbow with a Systems Spray-Cooled roof and elbow. The 2021 turnkey project includes a first-ever Spray-Cooled gravity-drained EAF roof and elbow and includes modifying the gantry to replace the existing 4-point long gantry arms with new, shorter, 2-point cantilever roof arms, as well as the design, supply, and installation of all conversion piping and required infrastructure changes. This project is expected to be the first phase of a multi-phase meltshop upgrade.