HydroVision International 2019
Tweet
Sessions
Speakers
Exhibitors
Products
Press Releases
Floor Plan
Buzz
Search
Sessions
(29)
View/Sort by
Tracks
|
Day
Details
Hydro Generator Rim Support Ledge Fatigue and Repair
(
Room
C123
)
24 Jul 19
8:30 AM
-
10:00 AM
Permanent Magnet Synchronous Generator Design Verification for Renewable Energy Conversion
24 Jul 19
8:30 AM
-
10:00 AM
Repair of a Vertical Shaft Hydro Generator Rotor With Cracked Rim Support Ledges
(
Room
C123
)
24 Jul 19
8:30 AM
-
10:00 AM
Session 1B: Practical Issues and Applications for Generators and Pumped Storage Units
(
Room
C123
)
24 Jul 19
8:30 AM
-
10:00 AM
Submersible Pump-Turbine Configuration to Reduce the Civil Costs of Pumped Storage Hydropower
(
Room
C123
)
24 Jul 19
8:30 AM
-
10:00 AM
U.S. Bureau of Reclamation Grand Coulee Third Power Plant: Modernization Gets a Head Start
(
Room
C123
)
24 Jul 19
8:30 AM
-
10:00 AM
Automatic Combination (CAM) Curve Optimizing System for Kaplan and Bulb Turbines
(
Room
C123
)
24 Jul 19
11:00 AM
-
12:30 PM
Influence of Primary Frequency Control on Kaplan Runner Designs
(
Room
C123
)
24 Jul 19
11:00 AM
-
12:30 PM
Maintaining Penstock Protection During a Digital Controls Upgrade: A Review of Approaches and Risks
(
Room
C123
)
24 Jul 19
11:00 AM
-
12:00 PM
Modern Control of Impulse Turbines to meet CAISO Ancillary Services Requirements and Support Work Force Changes – A Case Study
(
Room
C123
)
24 Jul 19
11:00 AM
-
12:30 PM
Session 2B: Modern Hydro Control Systems
(
Room
C123
)
24 Jul 19
11:00 AM
-
12:30 PM
Smooth Operations: SCADA Control Modernization for a Flexible Future
(
Room
C123
)
24 Jul 19
11:00 AM
-
12:00 PM
Reduced Cost and Outage Duration Solutions for Core and Winding Repair of Large Synchronous Machines, After A Fault with Significant Damage
(
Room
C123
)
24 Jul 19
2:00 PM
-
4:30 PM
PEEK coated bearings improve reliability and efficiency of hydro generating units
(
Room
C123
)
24 Jul 19
2:30 PM
-
4:00 PM
Session 3B: Innovative Tools and Technology
(
Room
C123
)
24 Jul 19
2:30 PM
-
4:00 PM
Using an Air Gap Monitoring System During Initial Commissioning Stages
(
Room
C123
)
24 Jul 19
2:30 PM
-
4:00 PM
Waterhammer Simulations for KOPS II Pumped Storage HPP and Comparison with Measurements
(
Room
C123
)
24 Jul 19
2:30 PM
-
4:00 PM
Adaptions of a Model-tested Kaplan Turbine for a Cost-effective Hydro Power Plant Layout by Means of CFD
(
Room
C123
)
25 Jul 19
11:00 AM
-
12:30 PM
CFD Modeling and Verification of A Submersible Pump-turbine Runner
(
Room
C123
)
25 Jul 19
11:00 AM
-
12:30 PM
Customer Oriented Approach to the Design of New Mixed-flow Runner for HPP Lay
(
Room
C123
)
25 Jul 19
11:00 AM
-
12:39 PM
Dynamic Loads in the Rough Load Zone of Hydro Units
25 Jul 19
11:00 AM
-
12:30 PM
Quantifying the Potential Value of Unit Characteristics Based on Field Efficiency Tests and Archival Data Analyses
25 Jul 19
11:00 AM
-
12:30 PM
Session 4B: Turbines for Conventional Hydro and Pumped Storage
(
Room
C123
)
25 Jul 19
11:00 AM
-
12:30 PM
Stationary Cascade Testing of Low Head Free Jet Impulse Turbine Blades
(
Room
C123
)
25 Jul 19
11:00 AM
-
12:30 PM
High Efficiency Permanent Magnet Synchronous Machines for Adjustable Speed Pumped Storage Hydro
25 Jul 19
3:00 PM
-
4:30 PM
Innovating New Technologies and Strategies Incorporated at the Low-head Ravenna Hydroelectric Project
(
Room
C123
)
25 Jul 19
3:00 PM
-
4:30 PM
Session 5B: Solving Hydro Problems One Case at a Time
(
Room
C123
)
25 Jul 19
3:00 PM
-
4:30 PM
Success of Overcoming High Load Instability of Mica New Generating Units
(
Room
C123
)
25 Jul 19
3:00 PM
-
4:30 PM
Troubleshooting Hydro units and Auxiliary Equipment Using Vibration Analysis
(
Room
C123
)
25 Jul 19
3:00 PM
-
4:30 PM
Home
Sessions
Speakers
Exhibitors
Products
Press Releases
Floor Plan
Tweet
Login
|
Back to top
ChirpE